Bayside Elementary School


Arrow
Arrow
Slider



Sector:Education
Sub-Sector:Elementary Schools
K-12
Delivery Methods:Lease-Leaseback
Services Provided:Program Management
Project Management
Construction Management
Program Name:South Bay Union School District

Bayside Elementary School, Proposition X & Y Modernization Program | Imperial Beach, Ca

As a part of the South Bay Union School District’s Proposition X and Y modernization and renovation program, the Bayside Elementary School underwent a $7.3 Million transformation that included:

  • The Campus Permanent Classrooms have been completely renovated.
  • All of the Campus Relocatable Classrooms have been renovated.
  • The Library has been completely renovated.
  • The Multi-Purpose Building and Kitchen have been renovated.
  • The Administration Building has been completely renovated.
  • The Campus electrical systems including Power and Low Voltage systems, such as Fire Alarm and PA system with Clocks, have been fully upgraded.
  • Students now have access to computers and modern technology in all of the classrooms.
  • Accessibility (ADA) upgrades and improvements to the school site, including restrooms, classrooms, and playgrounds, have been completed.
  • Old and deteriorating plumbing, including sewer systems, have been repaired and in some cases replaced.
  • Student and Staff restrooms have been renovated and repaired.
  • Old windows have been replaced with new windows in permanent buildings.
  • Student safety has been enhanced by installing additional site security fencing with controlled access gates.
  • General site improvements, including replacing deteriorating concrete sidewalks and steps, are now complete.
  • Campus interim housing during modernization construction.
  • AB300 Structural Seismic upgrades completed.
  • This program is nationally recognized as the Gold Winner of the CONSTRUCTECH VISION AWARD for its application of modern technologies, including a fully integrated P6 and Prolog database infrastructure.

  • SCOPE OF WORK PERFORMED:
  • Program Management
  • Project Management
  • Construction Management
  • Division of State Architect Coordination
  • State Allocation Board Bond Oversight
  • Citizens Bond Oversight Committee

  • Value of Work Managed to Date:
  • $7.3 Million
  • buildingPropx.com